2006 Melbourne Commonwealth Games
2006 Melbourne Commonwealth Games
The Opening and Closing Ceremonies of the 2006 Melbourne Commonwealth Games required a hydraulically operated scenic bridge for the 6,000 athletes to enter the arena, and a 97m circular stage with a central steel structure to feature as a ceremony highlight. ES GLOBAL's role was to design, build, and project manage the manufacture, installation and removal of the bridge and stage.