![](https://es.global/wp-content/uploads/2024/01/esglobal-history-2023-8-1024x683.jpg)
London 2012 Aquatics Consultancy
London 2012 Aquatics Consultancy
The Aquatics Centre was originally designed before London was awarded the 2012 Olympic Games. Once London became the host city, a solution was required to increase the seating capacity for the venue. ES GLOBAL was contracted by Zaha Hadid as a consultant for the temporary aspect of the venue. The two wings provided an additional 15,000 seats, increasing the capacity to 17,500
![](https://es.global/wp-content/uploads/2024/01/3420120816134936.jpg)